Hilton Head PSD #1 is a large public water system in EPA region 4 that provides tap water for the 29926 zip codes. It has 12 facilities where the water supply was tested for 68 chemical contaminants that impact tap water quality and human health.
The maximum reported level of HAA5 (five regulated haloacetic acids) was 15.16 µg/L. The maximum reported level of Manganese was 31.1 µg/L. The maximum reported level of quinoline was 0.0281 µg/L. Some (1 of 16 or 6%) of the latest water samples showed levels of quinoline that were at or above unsafe concentration levels. There were 3 contamintants found in the Hilton Head PSD #1 water supply at levels that were above the minimum reporting level. 1 of the contaminants were above the reference level, which means they may pose a risk to human health.
Hilton Head PSD RO Facility
Ground Water (GW)TREATED WATER ENTRY POINTEntry Point to the Distribution System (EP)
Leg-O-Mutton Plant
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Seabrook Plant
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Wild Horse Rd. Plant
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
BJW & SA Intertie
Surface Water (SW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Fire Station Plant
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Union Cemetary Plant
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
DISTRIBUTION SYSTEM
Multiple Sources (MX)79 Bram's Point RoadDistribution System (DS)
12 Chantilly LaneDistribution System (DS)
6 Cherry Hill LaneDistribution System (DS)
120 Coggins Point RoadDistribution System (DS)
Squire Pope Plant
Ground Water (GW)EPTDS from Squire Pope PlantEntry Point to the Distribution System (EP)
Windmill Harbor Plant
Ground Water (GW)EPTDS from Windmill Harbor PlantEntry Point to the Distribution System (EP)
Distribution System
Multiple Sources (MX)8 Ribaut RoadMaximum Residence Time (MR)
Front Gate Plant
Ground Water (GW)Front Gate PlantEntry Point to the Distribution System (EP)
The latest water samples were taken on June 10th, 2025.