Vestal Consolidated Water District #1 is a large public water system in EPA region 2 that provides tap water for the 13850 zip codes. It has 13 facilities where the water supply was tested for 78 chemical contaminants that impact tap water quality and human health.
The maximum reported level of HAA5 (five regulated haloacetic acids) was 24.433 µg/L. The maximum reported level of Manganese was 471 µg/L. Some (1 of 10 or 10%) of the latest water samples showed levels of Manganese that were at or above unsafe concentration levels. There were 2 contamintants found in the Vestal Consolidated Water District #1 water supply at levels that were above the minimum reporting level. 1 of the contaminants were above the reference level, which means they may pose a risk to human health.
Wellfield 4 TF
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Well 5-1 TP
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Well 1-2A & 1-3 TP
Ground Water (GW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Binghamton Water Intertie
Surface Water (SW)Entry Point to Dist. SystemEntry Point to the Distribution System (EP)
Distribution System
Multiple Sources (MX)WEST HILLDistribution System (DS)
Distribution System - SW
Surface Water (SW)DSMRT for Binghamton WaterMaximum Residence Time (MR)
Distribution System - GW
Ground Water (GW)DSMRT for Wellfield 4 TFMaximum Residence Time (MR)
DSMRT for Well 5-1 TPMaximum Residence Time (MR)
DSMRT for Well 1-2A & 1-3 TPMaximum Residence Time (MR)
WELLFIELD 4 TREATMENT FACILITY
Ground Water (GW)TREATMENT PLANTEntry Point to the Distribution System (EP)
WELL 5-1 TREATMENT PLANT
Ground Water (GW)TREATMENT PLANTEntry Point to the Distribution System (EP)
WELL 1-2A & 1-3 TREATMENT PLANT
Ground Water (GW)TREATMENT PLANTEntry Point to the Distribution System (EP)
TREATMENT PLANT WELLFIELD 4
Ground Water (GW)TREATMENT PLANT WEL EP003Entry Point to the Distribution System (EP)
TREATMENT PLANT, WELL 5-1
Ground Water (GW)TREATMENT PLANT, WE EP002Entry Point to the Distribution System (EP)
TREATMENT PLANT, WELLS 1-2A & 1-3
Ground Water (GW)TREATMENT PLANT, WE EP004Entry Point to the Distribution System (EP)
The latest water samples were taken on September 26th, 2024.