Village of Kiryas Joel is a large public water system in EPA region 2 that provides tap water for the 10950 zip codes. It has 19 facilities where the water supply was tested for 75 chemical contaminants that impact tap water quality and human health.
The maximum reported level of HAA5 (five regulated haloacetic acids) was 6.435 µg/L. The maximum reported level of Manganese was 2020 µg/L. Some (4 of 10 or 40%) of the latest water samples showed levels of Manganese that were at or above unsafe concentration levels. There were 2 contamintants found in the Village of Kiryas Joel water supply at levels that were above the minimum reporting level. 1 of the contaminants were above the reference level, which means they may pose a risk to human health.
Old Plant
Ground Water (GW)Old PlantEntry Point to the Distribution System (EP)
New Plant
Ground Water (GW)New PlantEntry Point to the Distribution System (EP)
Well 8-9
Ground Water (GW)Well 8-9Entry Point to the Distribution System (EP)
Brenner wells
Ground Water (GW)Brenner wellsEntry Point to the Distribution System (EP)
Cornwall well
Ground Water (GW)Cornwall WellEntry Point to the Distribution System (EP)
Grand Food
Ground Water (GW)Grand FoodDistribution System (DS)
K&J Auto
Ground Water (GW)K&J AutoDistribution System (DS)
Distribution System
Ground Water (GW)Atzei TempleMaximum Residence Time (MR)
Wellhouse #8A/9B Treatment Facility
Ground Water (GW)EPTDS from Wellhouse #8A/9B TFEntry Point to the Distribution System (EP)
TREATMENT PLANTEntry Point to the Distribution System (EP)
New Filter Plant Treatment Facility
Ground Water (GW)EPTDS from New Filter Plant TFEntry Point to the Distribution System (EP)
TREATMENT PLANTEntry Point to the Distribution System (EP)
Old Filter Plant Treatment Facility
Ground Water (GW)EPTDS from Old Filter Plant TFEntry Point to the Distribution System (EP)
TREATMENT PLANTEntry Point to the Distribution System (EP)
Brenner Treatment Facility
Ground Water (GW)EPTDS from Brenner TFEntry Point to the Distribution System (EP)
TREATMENT PLANTEntry Point to the Distribution System (EP)
OLD FILTER PLANT TREATMENT FACILITY
Ground Water (GW)OLD PLANT EP003Entry Point to the Distribution System (EP)
WELLHOUSE #8A,9B TREATMENT FACILITY
Ground Water (GW)WELL 8-A&9-B EP001Entry Point to the Distribution System (EP)
NEW FILTER PLANT TREATMENT FACILITY
Ground Water (GW)NEW PLANT EP002Entry Point to the Distribution System (EP)
WELL #9B
Ground Water (GW)WELL #9B EP001SR (SR)
WELL #8A
Ground Water (GW)WELL #8A EP002SR (SR)
WELL #22
Ground Water (GW)WELL #22 EP004SR (SR)
TREATMENT FACILITY(BRENNER)
Ground Water (GW)BRENNER EP004Entry Point to the Distribution System (EP)
The latest water samples were taken on May 14th, 2025.